Q-26-0323 Rev A

Monash Research Labs · Lab pure water loop — 18 MΩ polishing
Xero · synced 09:12 Demo 09 Oct 2026
Accepted
Accepted 12 Jun 2026 — project AQ-2623 raised
Clayton VIC 3168 · Delivered to site · 12 weeks · prepared by Priya Raman
Cost (A$)
$165,094
parts $103,695 · 763 hrs labour $61,399
Price ex GST (A$)
$252,657
26 lines · 1 groups
Margin
$87,562
34.7% of price
Total inc GST
$277,922
GST $25,265.65
Bill of materials & labour Accepted
Stock codeQtyUnitUnit costMarkupUnit sellLine (A$)
Hospital CSSD pure water plant — duplex (AS/NZS 4187)$252,657
MEM-LE-440
FilmTec LE-440i 8" low-energy RO element
8 ea $925.42 33% $1,230.81 $9,846.48
PV-80S-6
Codeline 80S30 8" pressure vessel, 6-element, 300 psi
2 ea $2,868.97 30% $3,729.66 $7,459.32
PMP-CRN-10
Grundfos CRN 10-12 stainless multistage pump
2 ea $6,420.00 30% $8,346.00 $16,692.00
FIL-H40-7
Cartridge housing 7-round 40" 316SS
2 ea $3,950.00 30% $5,135.00 $10,270.00
FIL-C40-1
Cartridge 40" 1 µm absolute pleated
14 ea $46.00 55% $71.30 $998.20
MED-RESIN
Softening resin, 25 L
10 bag $165.00 45% $239.25 $2,392.50
FIL-UV-40
UV steriliser 40 m³/h
1 ea $8,950.00 30% $11,635.00 $11,635.00
PMP-DDA-7
Grundfos DDA 7.5-16 smart dosing pump
2 ea $1,690.00 35% $2,281.50 $4,563.00
INS-COND
Signet 2850 conductivity sensor + 9900 transmitter
4 ea $1,480.00 35% $1,998.00 $7,992.00
INS-PT-10
Pressure transmitter 0–10 bar
4 ea $420.00 35% $567.00 $2,268.00
INS-PH-ORP
pH / ORP analyser with sensors
1 ea $2,150.00 32% $2,838.00 $2,838.00
VLV-SOL-25
Solenoid valve 25 mm
6 ea $410.00 40% $574.00 $3,444.00
PIP-316-50
316 SS pipe 50 NB Sch10, 6 m
12 length $410.00 30% $533.00 $6,396.00
PIP-FIT-SET
Pipe fittings, supports & fasteners — set
2 set $1,450.00 35% $1,957.50 $3,915.00
ELE-PLC
CompactLogix PLC kit with I/O
1 ea $6,850.00 30% $8,905.00 $8,905.00
ELE-HMI
PanelView 10" HMI
1 ea $3,120.00 30% $4,056.00 $4,056.00
ELE-VSD-15
VSD 15 kW (ABB ACS580)
2 ea $3,350.00 30% $4,355.00 $8,710.00
ELE-RTU
4G remote monitoring RTU + SCADA licence
1 ea $1,890.00 40% $2,646.00 $2,646.00
ELE-CABLE
Cable, trays & sundries — lot
1 lot $2,200.00 30% $2,860.00 $2,860.00
SKD-RO-316
RO skid frame, 316SS
2 ea $7,200.00 30% $9,360.00 $18,720.00
LAB-ENG
Process engineering & design
126 hr $95.00 94.7% $185.00 $23,310.00
LAB-DRAFT
Drafting — 2D/3D & P&ID
72 hr $70.00 100% $140.00 $10,080.00
LAB-FAB
Workshop fabrication & assembly
324 hr $72.00 87.5% $135.00 $43,740.00
LAB-ELEC
Electrical, PLC & SCADA
198 hr $82.00 82.9% $150.00 $29,700.00
LAB-FAT
Factory acceptance test
43 hr $75.00 86.7% $140.00 $6,020.00
LAB-OMM
O&M manuals, logbook & drawings
1 lot $1,600.00 100% $3,200.00 $3,200.00
Scope & exclusions
Design, supply, factory test and commission as per the line items. Includes HAZOP, O&M manuals, operator training and 12 months' defects liability.
Exclusions: Civil works, slabs and footings; feed and reject pipework beyond the container/skid flanges; power supply to the MCC; potable storage beyond the product tank; import duties and taxes at destination unless stated.
Customer
Customer
Monash Research Labs
Contact
Dr Anika Shah · 08 7246 4220
Country
Australia
Currency
AUD
Terms
30 days
Delivery
Delivered to site